4-21. G-12E - SERVICE (Cont)
4-21
PACKING (Cont.)
8.
Tying the canopy, suspension lines, and center line.
CANOPY
a.
Beginning at a point 3 feet above the canopy skirt reinforcement (lower lateral band), tie the canopy using
one turn single cotton thread (Item 8, Appendix D).
b.
Secure the tie with a surgeon's knot and a locking knot. Trim the tie ends to 2 inches.
c.
Repeat steps a and b above at subsequent 5-foot intervals along the remaining length of the canopy.
GO TO NEXT PAGE
4-59