• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Installation of Outrigger Weldment Assembly
Procedures to Check for Platform Bowing

TM-10-1670-268-20P The Type V Airdrop Platform and Dual Airdrop Platform Manual
Page Navigation
  47    48    49    50    51  52  53    54    55    56    57  
                                                                   TM 10-1670-268-20&P                                            0004 00 0004 00-23 (4) Reposition weldment if necessary.  Install bolt and washer from the underside of the platform.  Thread a 3/8-inch nut onto bolt by hand.  Repeat for remaining bolt-holes on weldment. g.    Completing Assembly Procedure. (a)  Using a ¾-inch socket or wrench, tighten the weldment to the link. (b)  Using a 9/16-inch socket or wrench, tighten the weldment to the platform panel. WELDMENT SECURED TO LINK WELDMENT SECURED TO PLATFORM PANEL







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.