• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
24-FOOT DIAMETER TROOP CHEST RESERVE (T-10R) PARACHUTE AND MIRPS ILLUSTRATED LIST OF MANUFACTURED ITEMS CONT. - TM-10-1670-269-23P_311
ALPHABETICAL INDEX CONT. - TM-10-1670-269-23P_314

TM-10-1670-269-23P Parachute Personnel Type: 24-Foot Diameter Troop Chest Reserve (T-10R) NSN 1670-00-892-4218 Manual
Page Navigation
  248    249    250    251    252  253  254    255    256    257    258  
TM 10-1670-269-23&P Index-1 B ALPHABETICAL INDEX Subject    WP Sequence No. – Page No. A Accomplishing a Log Record ..........................................................................................................0004 00-3 Accordion Folding/Rigger Rolling....................................................................................................0033 00-2 Acronyms and Abbreviations List....................................................................................................0001 00-3 Airing (and Shakeout)......................................................................................................................0008 00-1 Army Parachute Log Record (MIRPS)............................................................................................0013 00-30 Army Parachute Log Record (T-10R) .............................................................................................0012 00-28 Army Regulations (References) ......................................................................................................0043 00-1 Assembling the MIRPS Parachute..................................................................................................0005 00 -1 Assembling the T-10R Parachute ...................................................................................................0005 00-1 Basting and Temporary Tacking (DS).............................................................................................0034 00-1 Basting and Temporary Tacking (Unit) ...........................................................................................0014 00-1 Bridle Line .......................................................................................................................................0018 00-1 Bulk Materials..................................................................................................................................0053 00-1 C Canopy Gore Section......................................................................................................................0020 00-1 Canopy Gore Section......................................................................................................................0038 00-1 Clean Metal Items ...........................................................................................................................0009 00-3 Cleaning and Drying........................................................................................................................0009 00-1 Closing Pack and Stowing Pilot Chute (T-10R) ..............................................................................0012 00-21 Closing the Pack (MIRPS) ..............................................................................................................0013 00-26 Completion of Packing (MIRPS) .....................................................................................................0013 00-30 Completion of Packing (T-10R).......................................................................................................0012 00-28 Components of the Parachute Assembly........................................................................................0002 00-1 Configuration/Condition...................................................................................................................0004 00-1 Connector Snap ..............................................................................................................................0026 00-1 Conservation of Resources.............................................................................................................0006 00-1 Corrosion Prevention and Control...................................................................................................0001 00-2 D   Darning (Unit) ..................................................................................................................................0014 00-4 Destruction of Army Material to Prevent Enemy Use......................................................................0001 00-2 Detailed Inspection..........................................................................................................................0010 00-2 Differences Between Models ..........................................................................................................0002 00-1 Drop-Testing Criteria.......................................................................................................................0006 00-2 Drying Fabric Items .........................................................................................................................0009 00-3







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.