• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SECTION III.  TOOL AND TEST EQUIPMENT REQUIREMENTS - TM-10-1670-271-23P_217
APPENDIX C REPAIR PARTS AND SPECIAL TOOLS LIST - TM-10-1670-271-23P_219

TM-10-1670-271-23P Parachute Personnel Type: 35-Foot Diameter T-10B Troop Back Parachute Assembly NSN 1670-00-091-0720 Manual
Page Navigation
  197    198    199    200    201  202  203    204    205    206    207  
ARMY TM 10-1670-271-23&P AIR FORCE TO 14D1-2-464-2 MARINE CORPS TM 01136B-23&P/1 Section III.  TOOLS AND TEST EQUIPMENT REQUIREMENTS (CONT) TOOL/TEST MAINT. NOMENCLATURE NATIONAL/NATO PN EQUIPMENT CATEGORY STOCK NUMBER TOOL REF CODE No. (1) (2) (3) (4) (5) 23 Press, Hand Operated 24 Scale, Push-Pull 25 Scale, Spring, 0-80 lbs 6635-00-705-5469 800 26 Screwdriver, Flat Tip 27 Separator, Connector Link 1670-00-072-4941 11-1-176 28 Shears 29 Stow Hook 30 Tool Kit, Canopy Release 5180-01-319-6969 71304 31 Wrench, Allen Type, Hexagon Section IV.  REMARKS Reference Remarks/Notes Code A During the final year of personnel canopy age life, only organizational level maintenance is authorized (reference TB 43-0002-4*). *Will be superseded by TB 43-0002-43 B Inspect is a technical-rigger type Inspection, other Inspections in para.  2-9 and 2-13. C Service is cleaning & drying, shakeout and airing of equipment, and packing. D Service is the packing of parachutes. E Repair   by   restitching,   darning,   retacking,   or   restencil   canopy   panel.      Repair   at   unit maintenance  consists  of  darning,  restitching,  patching  and  replacement  of  parts  authorized for unit maintenance. F Intermediate repair consists of replacing gore sections, suspension lines and vent lines. G Test all fabrics and webbing material for acidity and salt-water contamination. Change 2 B-7/(B-8 blank)







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.