• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CLOSING THE DEPLOYMENT BAG AND STOWING THE SUSPENSION LINES CONT. - TM-10-1670-272-23P_106
CLOSING THE DEPLOYMENT BAG AND STOWING THE SUSPENSION LINES CONT. - TM-10-1670-272-23P_108

TM-10-1670-272-23P Parachute Personnel Type: 35-Foot Diameter MC1-1B Troop Back Parachute Assembly NSN 1670-00-598-0751 Manual
Page Navigation
  78    79    80    81    82  83  84    85    86    87    88  
TM 10-1670-272-23&P                                                       0011 00 0011 00-37 8.    Pull the suspension line loop through the left locking stow loop.  The end of the stow should extend 2-inches beyond the hoods of the locking stow loop. NOTE Flatten the deployment bag. 9.    Extend the suspension lines to the upper right corner of the deployment bag.  Form the first regular stow. NOTE Ensure the stow hook is around all suspension lines when making stows.  Regular stows should extend through the stow loops to the outer edge of the reinforcement panels, but not more than 1-inch beyond the outer edge of the stow loop.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.