• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
UNIT MAINTENANCE MC1-1B/MC1-1E TROOP BACK PARACHUTE ASSEMBLY DEPLOYMENT BAG CONT. - TM-10-1670-272-23P_206
UNIT MAINTENANCE MC1-1B/MC1-1E TROOP BACK PARACHUTE ASSEMBLY DEPLOYMENT BAG CONT. - TM-10-1670-272-23P_208

TM-10-1670-272-23P Parachute Personnel Type: 35-Foot Diameter MC1-1B Troop Back Parachute Assembly NSN 1670-00-598-0751 Manual
Page Navigation
  169    170    171    172    173  174  175    176    177    178    179  
TM 10-1670-272-23&P                                                         0030 00 0030 00-11 (3)    Align the two ends of the buffer and stitch the static line in place, using a heavy-duty sewing   machine, size 6, nylon cord, 5 to 8 stitches per inch, and a static line stitch formation 4- inches long. (4)    Attach a serviceable snap hook to the opposite end of the new line; make sure the fold is on   the side opposite the snap hook button. NOTE The folded edge of the static line will be facing outward when passing the static line through the snap hook.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.