• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Accomplishing a Log Record CONT. - TM-10-1670-272-23P_36
Accomplishing a Log Record CONT. - TM-10-1670-272-23P_38

TM-10-1670-272-23P Parachute Personnel Type: 35-Foot Diameter MC1-1B Troop Back Parachute Assembly NSN 1670-00-598-0751 Manual
Page Navigation
  14    15    16    17    18  19  20    21    22    23    24  
TM 10-1670-272-23&P                                                         0003 00 0003 00-7 a.  MWO number.  Enter the publication number and date of the Modification Work Order, which       describes the MWO (1, see illustration below). b.   MWO title.  Enter a short, abbreviated title extracted from the MWO prescribing the work. c.   Modified by.  Enter the last name of the individual who has performed the modification.  If the original log record for the parachute has been lost, and it has been ascertained through inspection that a particular modification has been accomplished, the entry for this column will be C/W, complied with (2, in the illustration detailed above), which signifies the applicable MWO has been complied with.    d.  Inspected by.  The individual who accomplished the inspection required after modification will sign        this entry with last name only. e.  Unit.  Enter the unit designation responsible for performing the MWO or in the event of a lost Log           Record, the unit to which the inspector is assigned.     f.   Date.  Enter the day, month, and year the modification work was completed. 4.    Unit and Direct Support repair and inspection date.  When a parachute canopy assembly is initially received from a supply source and a technical/rigger-type inspection is performed, the inspection accomplishment will be documented on the “Unit and Direct Support Maintenance Repair and Inspection Data” page of the individual Parachute Log Record.  Additional entries will also be made on this page each time the canopy assembly is repaired or is administered an inspection in compliance with a one-time inspection Technical Bulletin (TB).  The page completion criteria is as follows: a.  Type of repair.  Enter the type of repair, completion of initial inspection, repair        accomplishment, Technical Bulletin Inspection compliance. b.  Inspection by.  The individual who accomplished the inspection required will sign this        entry with last name. c.  Unit.  Enter the unit designation responsible for performing the type of repair. d.    Date.  Enter the day, month, and year the repair was performed.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.