Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
CHAPTER 1 INTRODUCTION - TM-10-1670-276-23P_7
Maintenance Forms and Records - TM-10-1670-276-23P_8
Preparation for Storage or Shipment - TM-10-1670-276-23P_9
Section II. EQUIPMENT DESCRIPTION AND DATA - TM-10-1670-276-23P_10
Equipment Data - TM-10-1670-276-23P_11
Functional Description of Major Components - TM-10-1670-276-23P_12
CHAPTER 2 UNIT AND INTERMEDIATE DIRECT SUPPORT (DS) MAINTENANCE INSTRUCTIONS - TM-10-1670-276-23P_13
Section II. SERVICE UPON RECEIPT
Initial Receipt
Figure 2-1. Installing Attachment Tie on Parachute Log Record
Figure 2-3. Inside Back Cover of Parachute Log Record - TM-10-1670-276-23P_17
Figure 2-4. Log Record Entrees for the Modification Work Order Compliance Record Page
Figure 2-6. Data Entries for a Log Record Note Page - TM-10-1670-276-23P_19
Checking Unpacked Equipment After Shipment - TM-10-1670-276-23P_20
Section IV. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
Table 2-1. Unit and Intermediate Direct Support (DS) Preventive Maintenance Checks and Services (PMCS).
Section V. UNIT AND INTERMEDIATE DIRECT SUPPORT (DS) MAINTENANCE PROCEDURES
Shakeout and Airing - TM-10-1670-276-23P_24
Figure 2-7. Shakeout - TM-10-1670-276-23P_25
Cleaning and Drying. - TM-10-1670-276-23P_26
Cleaning Fabric Items with Cleaning Solvent
Cleaning and Drying (cont) - TM-10-1670-276-23P_28
Cleaning and Drying (cont) - TM-10-1670-276-23P_29
Inspection - TM-10-1670-276-23P_30
Inspection CONT. - TM-10-1670-276-23P_31
Inspection (cont) - TM-10-1670-276-23P_32
Acidity Test
Salt-Water Contamination Test - TM-10-1670-276-23P_34
Packing the 26-Foot Cargo Parachute
Packing the 26-Foot Cargo Parachute (cont) - TM-10-1670-276-23P_36
Figure 2-8. Riggers Orientation - TM-10-1670-276-23P_37
Figure 2-10. Removing Inversion - TM-10-1670-276-23P_38
Figure 2-11. Removing Partial Inversion
Figure 2-12. Removing Turns - TM-10-1670-276-23P_40
Figure 2-13. Removing Tangles - TM-10-1670-276-23P_41
Figure 2-14. Removing Twists
Figure 2-15. Suspension Line Separation - TM-10-1670-276-23P_43
Figure 2-16. Attaching Static Line to Deployment Bag
Figure 2-17. Flipping Right Gore Group
Figure 2-19. Draping Folded Gores to Right Side of Table
Figure 2-20. Folding Completed, Lines Separated.
Figure 2-21. Canopy in Flat Fold
Figure 2-22. Canopy Longfolded
Packing the 26-Foot Cargo Parachute (cont) - TM-10-1670-276-23P_50
Figure 2-23. Attaching Deployment Bag for Non-Breakaway Static Line
Figure 2-24. Attaching Deployment Bag Retaining Tie and Breakaway Static Line
Figure 2-25. Canopy Stowage Completed.
Figure 2-27. Bag Closing Tie Completed.
Figure 2-28. First Suspension Line Stow
Figure 2-30. Suspension Line Stow Complete
Figure 2-31. Riser Securing Ties Positioned.
Figure 2-33. Suspension Line Protector Flap Closed and Secured.
Completing the Pack
Figure 2-35. Parachute Pack Completed
Section VI. REPAIR - TM-10-1670-276-23P_61
Sewing Procedures. - TM-10-1670-276-23P_62
Table 2-2. Sewing Machine Code Symbols - TM-10-1670-276-23P_63
Table 2-3. Stitching and Restitching Specifications - TM-10-1670-276-23P_64
Figure 2-36. Darning Method Using a Darning Sewing Machine
Figure 2-37. Hand Darning Method
Figure 2-38. Repair Method Using a Zig-Zag Sewing Machine
Searing and Waxing - TM-10-1670-276-23P_68
Marking and Restenciling - TM-10-1670-276-23P_69
Parachute Canopy - TM-10-1670-276-23P_70
Bridle Loop - TM-10-1670-276-23P_71
Vent Lines - TM-10-1670-276-23P_72
Figure 2-40. Vent Line Replacement Details
Vent Reinforcement Tape (Upper Lateral Band) - TM-10-1670-276-23P_74
Vent Reinforcement Tape (Upper Lateral Band) CONT. - TM-10-1670-276-23P_75
Figure 2-41. Vent Reinforcement Tape Splicing Details
Gore Section - TM-10-1670-276-23P_77
Gore Section (cont) - TM-10-1670-276-23P_78
Figure 2-42. Patch Application, Stitch Method
Gore Section (cont) - TM-10-1670-276-23P_80
Figure 2-44. Gore Section 1, Replacement Details
Figure 2-45. Reinstalling Pocket Band
Gore Section (cont) - TM-10-1670-276-23P_83
Figure 2-46. Gore Section 2, Replacement Details
Figure 2-47. Gore Section 3, Replacement Details
Radial Tape - TM-10-1670-276-23P_86
Figure 2-48. Radial Tape Splicing Details - TM-10-1670-276-23P_87
Vertical Tape - TM-10-1670-276-23P_88
Figure 2-49. Vertical Tape Splicing Details
Skirt Reinforcement Tape (Lower Lateral Band)
Figure 2-50. Skirt Reinforcement Tape Splicing Details
Pocket Band - TM-10-1670-276-23P_92
Figure 2-51. Pocket Band Replacement Details
Suspension Line Attaching Loop.
Figure 2-52. Suspension Line Attaching Loop Replacement Details
Suspension Line - TM-10-1670-276-23P_96
Figure 2-53. Suspension Line Splicing Details.
Figure 2-55. Inserting Splicing Aid into Cord Casing
Figure 2-56. Securing Suspension Line at Suspension Line Attaching Loop.
Suspension Line - TM-10-1670-276-23P_100
Figure 2-58. Securing Suspension Line at Riser Suspension Line Attaching Loop
Riser - TM-10-1670-276-23P_102
Figure 2-60. Riser Splicing Details
Figure 2-61. Riser Suspension Line Attaching Loops Construction Details
Riser (cont) - TM-10-1670-276-23P_105
Figure 2-62. Riser Assembly Construction Details
Right riser strap
Deployment Bag - TM-10-1670-276-23P_108
Deployment Bag Attaching Loop
Figure 2-63. Attaching Loop Fabrication Details
Deployment Bag Main Strap (Side and Center)
Figure 2-64. Main Strap Splicing Details
Figure 2-65. Center Main Strap Construction Details.
Figure 2-66. Center Main Strap Installation Details
Deployment Bag Main Strap (Side and Center) (cont)
Figure 2-67. Side Main Strap Replacement Details
Deployment Bag Static Line Retaining Strap
Deployment Bag Suspension Line Retaining Strap - TM-10-1670-276-23P_118
Figure 2-68. Suspension Line Retaining Strap Replacement Details.
Deployment Bag Tie Loops
Figure 2-69. Protector Flap Tie Loop Replacement Details
Deployment Bag Panels and Flaps - TM-10-1670-276-23P_122
Figure 2-70. Patching Deployment Bag Panels and Flaps
Static Line - TM-10-1670-276-23P_124
Figure 2-71. Retaping Static Line Clevis Attaching Loop
Figure 2-72. Static Line Construction Details
Static Line Clevis - TM-10-1670-276-23P_127
Figure 2-73. Replacing Clevis Pin Retaining Cord
In-Storage Inspection - TM-10-1670-276-23P_129
Shipment - TM-10-1670-276-23P_130
Figure 2-74. Accordion Folding a Parachute Canopy Assembly
Rigger Rolling - TM-10-1670-276-23P_132
Figure 2-75. Rigger Rolling a Parachute Canopy Assembly
APPENDIX A REFERENCES - TM-10-1670-276-23P_134
Joint Regulations - TM-10-1670-276-23P_135
APPENDIX B MAINTENANCE ALLOCATION CHART Section I. INTRODUCTION - TM-10-1670-276-23P_136
Explanation of Columns in the MAC, Section II - TM-10-1670-276-23P_137
Section II. MAINTENANCE ALLOCATION CHART FOR 26-FOOT DIAMETER HIGH-VELOCITY CARGO PARACHUTE ASSEMBLY
26-FOOT DIAMETER HIGH-VELOCITY CARGO PARACHUTE ASSEMBLY (cont) - TM-10-1670-276-23P_139
26-FOOT DIAMETER HIGH-VELOCITY CARGO PARACHUTE ASSEMBLY (cont) - TM-10-1670-276-23P_140
Section III. TOOL AND TEST EQUIPMENT REQUIREMENTS - TM-10-1670-276-23P_141
Section IV. REMARKS - TM-10-1670-276-23P_142
APPENDIX C REPAIR PARTS AND SPECIAL TOOLS LIST Section I. INTRODUCTION - TM-10-1670-276-23P_143
Source Code - TM-10-1670-276-23P_144
Maintenance code - TM-10-1670-276-23P_145
Recoverability code. - TM-10-1670-276-23P_146
Special information - TM-10-1670-276-23P_147
Explanation of Columns (Section IV) - TM-10-1670-276-23P_148
How to Locate Repair Parts.
Figure C-1. 26-Foot Diameter High- Velocity Cargo Parachute
GROUP 00 PARACHUTE, CARGO, HIGH-VELOCITY, 26-FOOT, RING-SLOT, COTTON
Figure C-2. 26-Foot Cargo Parachute Canopy
GROUP 01 CANOPY, PARACHUTE, CARGO, 26- FOOT
GROUP 01 CANOPY, PARACHUTE, CARGO, 26- FOOT CONT.
Figure C-3. Deployment Bag - TM-10-1670-276-23P_156
GROUP 02 DEPLOYMENT BAG, PARACHUTE - TM-10-1670-276-23P_157
Figure C-4. Static Line - TM-10-1670-276-23P_158
GROUP 03 STATIC LINE, CARGO PARACHUTE
GROUP 04 BULK MATERIALS - TM-10-1670-276-23P_160
CROSS REFERENCE INDEXES NATIONAL STOCK NUMBER INDEX - TM-10-1670-276-23P_161
CROSS REFERENCE INDEXES PART NUMBER INDEX - TM-10-1670-276-23P_162
APPENDIX D EXPENDABLE/DURABLE SUPPLIES AND MATERIALS LIST - TM-10-1670-276-23P_163
EXPENDABLE/DURABLE SUPPLIES AND MATERIALS LIST (cont) - TM-10-1670-276-23P_164
EXPENDABLE/DURABLE SUPPLIES AND MATERIALS LIST (cont) - TM-10-1670-276-23P_165
EXPENDABLE/DURABLE SUPPLIES AND MATERIALS LIST (cont) - TM-10-1670-276-23P_166
APPENDIX E ILLUSTRATED LIST OF MANUFACTURED ITEMS - TM-10-1670-276-23P_167
INDEX - TM-10-1670-276-23P_168
INDEX (cont) - TM-10-1670-276-23P_169
INDEX (cont) - TM-10-1670-276-23P_170
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business