• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
UNIT MAINTENANCE 28-FOOT DIAMETER CARGO EXTRACTION PARACHUTE LOG RECORD BOOK POCKET
UNIT MAINTENANCE 28-FOOT DIAMETER CARGO EXTRACTION PARACHUTE DEPLOYMENT BAG SAFETY CORD

TM-10-1670-277-23P Parachute Cargo Type: 28-Foot Diameter Cargo Extraction Parachute Assembly NSN 1670-00-040-8135 Manual
Page Navigation
  124    125    126    127    128  129  130    131    132    133    134  
TM 10-1670-277-23&P                                                       0040 00 0040 00-2 2.    Retacking.  Replace damaged or missing tacking as follows: a.    Remove damaged tacking. b.    Using a tacking needle and tape, lacing and tying, retack log record pocket to deployment bag using one turn single lacing.  Secure tacking ends with a surgeon’s knot and a locking knot. REPLACE Replace a missing or unserviceable parachute log record book pocket as follows: 1.    Position parachute log record book pocket on bottom of deployment bag with pocket bottom edge squared with end slot reinforcement. 2.    Hand tack pocket to riser webbing at four corners using a tacking needle and one turn single, tape, lacing and tying as in step 2., Retacking, above. 3.    Secure tacking ends with a surgeon’s knot and a locking knot.  Trim ends to ¼-inch. END OF WORK PACKAGE







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.