• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure  2-12.  Removing Partial Inversion
Figure  2-14.  Removing Tangles from Suspension Lines

TM-10-1670-278-23P Parachute Cargo Type: 15-Foot Diameter Cargo Extraction Parachute NSN 1670-01-063-3715 and NSN 1670-00-062-1648 Manual
Page Navigation
  33    34    35    36    37  38  39    40    41    42    43  
ARMY TM 10-1670-278-23&P AIR FORCE T.O. 13C5-26-2 NAVY NAVAIR 13-1-27 Figure  2-13.  Removing Turns from Suspension Lines. 1    Remove connector links from tension plate and remove a turn by rotating risers in direction opposite to direction of turn. 2    Reposition connector links on tension plate. (b)    Tangles.    To  remove  a  tangle,  or  tangles,  keep  the  two  groups  of  lines  separated  and  work  the tangle,  or  tangles,  as  close  to  the  connector  links  as  possible.    Detach  connector  links  from  the tension plate. 1    Select top line, or lines that form the tangle and, with left hand, lift line, or lines, away from other lines (figure 2-14). 2    Reach through opening, created by lifting the suspension lines, with right hand (figure 2-14) and pull adapter web or extraction line through opening (figure 2-14).  Do not permit risers to turn. 3    Replace connector links on tension plate. 2-29







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.