• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Deployment Bag Pendulum Line.
Figure 2-70.  Pendulum Line Replacement Details

TM-10-1670-279-23P Parachute Cargo Type: 22-Foot Diameter Cargo Extraction Parachute NSN 1670-01-063-3716 and NSN 1670-00-687-5408 Manual
Page Navigation
  127    128    129    130    131  132  133    134    135    136    137  
ARMY TM 10-1670-279-23&P AIR FORCE T.O.  13C5-27-2 NAVY NAVAIR 13-1-28 Figure 2-69.  Replacement Pendulum Line Construction Details. e.  Pass tapered cord end through deployment bag pendulum line attaching loop and attach tapered end to splicing aid. f.  Pull splicing aid back into cord casing at 6 1/2-inch mark and work aid back through cord casing to outside at 8- inch mark (figure 2-70). g.  Remove tapered cord end from splicing aid.  Sear tapered end and make an overhand knot in cord running end at a point 1 inch back from seared tapered end.  Stretch cord loop to draw knot against cord casing. 2-123







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.