ARMY TM 10-1670-279-23&P
AIR FORCE T.O. 13C5-27-2
NAVY NAVAIR 13-1-28
2-4. Initial Receipt (cont).
(c) Modified by. Enter last name of individual who has performed the modification. If original log record for
parachute has been lost, and it has been ascertained through inspection that a particular modification has been
accomplished, entry for this column will be C/W "Complied With" (2, figure 2-4), which signifies applicable MWO has
been complied with.
(d) Inspected by. The individual who accomplished the inspection required after modification will sign this
entry with his last name only.
(e) Unit. Enter the unit designation responsible for performing the MWO or in the event of a lost Log
Record, the unit to which the inspector is assigned.
(f)
Date. Enter the day, month, and year the modification work was completed.
(4)
Unit and intermediate repair and inspection data. When a parachute canopy assembly is initially received
from a supply source and a technical/rigger-type inspection is performed, the inspection accomplishment will be
documented on the "Unit and Intermediate Repair and Inspection Data" page of the individual Parachute Log Record
(figure 2-5). Additional entries will also be made on this page each time the canopy assembly is repaired or is
administered an inspection in compliance with a one-time inspection Technical Bulletin (TB). The page completion
criteria is as follows:
(a)
Type of repair. Enter the type of repair, completion of initial inspection, repair accomplishment, Technical
Bulletin inspection compliance.
(b)
Inspection by. The individual who accomplished the inspection required will sign this entry with last name.
(c)
Unit. Enter the unit designation responsible for performing the type of repair.
(d)
Date. Enter the day, month and year the repair was performed.
Figure 2-5. Log Record Entries for Unit and Intermediate Repair and Inspection Data Page.
2-6
