• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Installing M-21 reefing line cutter - TM-10-1670-280-23P_121
Threading the reefing line cutter at line 61

TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Page Navigation
  93    94    95    96    97  98  99    100    101    102    103  
TM 10-1670-280-23&P                                                       0012 00 0012 00-12 e.    Insert the ¼-inch screw with serrated lock washer through the hole on the bottom of the bracket, into the threaded hole in the bottom end of the cutter and tighten the screw finger tight.   NOTE A four-line check for proper layout shall be performed before applying tension. f. Rigger check number 1. 5.    Applying tension.  Attach the nylon webbing strap routed through the connector links to a tension device and apply tension.    NOTE A tension jack, chain hoist, power winch, or a vehicle may be used as a tension device when applying tension to the parachute. 6.    Threading the reefing line cutter at line 61. NOTE The G-11C uses two 10-foot type IV reefing lines.  The reefing lines will be fabricated IAW the instructions in WP 0060 00, ILLUSTRATED LIST OF MANUFACTURED ITEMS, of this manual.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.