• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Folding the gores and reefing the canopy cont. - TM-10-1670-280-23P_126
Completing center line installation cont. - TM-10-1670-280-23P_128

TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Page Navigation
  98    99    100    101    102  103  104    105    106    107    108  
TM 10-1670-280-23&P                                                       0012 00 0012 00-17 j. Route the running end of the webbing on the left side of the reefing line cutter through the end loop of the reefing line of the left gore group.    k.    Route the running end of the webbing on the right side of the reefing line cutter through the end loop of the reefing line of the right gore group. l. Secure the ends of the securing tie together over the reefing line cutter with a square knot.  Route one running end of the tie up through the side screw slot of the cutter bracket.    m.   Secure the running ends together with a square knot and a locking knot with an overhand knot in each running end.    n.    Trim ends to two-inches. CAUTION When installing the center line, ensure that it is not entangled or wrapped around the suspension lines or suspension risers. 8.    Completing center line installation. a.    Disconnect the bridle loop from the stationary post and dress the upper lateral band making sure the vent lines are centered and separated.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.