• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Lacing the deployment bag - TM-10-1670-280-23P_146
Installing reefing line cutter safety ties.  

TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Page Navigation
  118    119    120    121    122  123  124    125    126    127    128  
TM 10-1670-280-23&P                                                       0012 00 0012 00-37 f. Rigger check number 6. NOTE Proceed to LOG RECORD BOOK ENTRIES below for log book entries. NOTE Paragraphs (20) through (27) will be used when packing the G-11C in the nylon deployment bag. 20. Arming the reefing line cutters. a.    Position the two reefing line cutters on top of the stowed canopy with the cutter at suspension line 61 placed adjacent to the arming loop at the bag bottom and the cutter at suspension line 1 placed adjacent to the bag arming loop on the bag top. b.    Cut two 12-inch lengths of type III nylon cord for use as arming cable ties. c.    Beginning with the reefing line cutter at line 1 near the bag top, pass the end of one cord through the reefing line cutter arming cable and through the arming loop on the bag top.    d.    Draw the cord tight and secure the cord ends with a surgeon’s knot and locking knot.   







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.