• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Log record book entries - TM-10-1670-280-23P_155
UNIT MAINTENANCE 100-FOOT DIAMETER CARGO PARACHUTE G-11D PACKING PROCEDURES

TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Page Navigation
  127    128    129    130    131  132  133    134    135    136    137  
TM 10-1670-280-23&P                                                       0012 00 0012 00-46 29. Closing the riser extension flap. a.    Temporarily secure the riser extension flap until riser extension has been stowed.  Secure the flap at each corner and at the center with ¼-inch cotton webbing. b.    Remove the temporary ties, open riser extension flap and stow riser extension. c.    Bring the riser extension flap across the stowed riser extension. d.    Cut a 36-inch length of ¼-inch cotton webbing for use as a lacing tie. e.    With two half-hitches, secure an end of the webbing length to the first loop on the deployment bag main body at the right upper corner. f. Using the lacing tie running end, lace the riser extension cover flap to the deployment bag main body. g.    Secure the lacing tie free end to the last lace with two half-hitches. END OF WORK PACKAGE







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.