• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
UNIT MAINTENANCE 100-FOOT DIAMETER CARGO PARACHUTE G-11D PACKING PROCEDURES
PREPARING PARACHUTE FOR PROPER LAYOUT - TM-10-1670-280-23P_159

TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Page Navigation
  129    130    131    132    133  134  135    136    137    138    139  
TM 10-1670-280-23&P                                                       0013 00 0013 00-2 2.    Pack-In-Process Inspection.  A designated supervisory parachute rigger, other than the packer, must perform a pack-in process inspection at six intervals during the packing procedure.  The inspection is performed to ensure the parachute is packed according to authorized packing procedures (refer to WP 0009 00, INSPECTION). ORIENTATION   Throughout this manual, all directions (right, left, upper, lower, top, bottom, clockwise, and counterclockwise) are given from the rigger’s point of view, as the rigger stands looking from the parachute riser (tension device) toward the canopy vent (stationary post) at the tension plate end of the packing table facing the apex-hook end of the table. 1.    Top.  That portion of the equipment that is farthest from the packing surface. 2.    Bottom.  That portion of the equipment that is nearest to the packing surface.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.