• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Installing M-21 reefing line cutter.   cont.
Folding the gores and reefing the canopy - TM-10-1670-280-23P_170

TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Page Navigation
  140    141    142    143    144  145  146    147    148    149    150  
TM 10-1670-280-23&P                                                       0013 00 0013 00-13 5.    Applying tension.  Attach the nylon webbing strap routed through the connector links to a tension device and apply tension.    NOTE A tension jack, chain hoist, power winch, or a vehicle may be used as a tension device when applying tension to the parachute. 6.    Folding the gores and reefing the canopy.  Fold the canopy gores into two groups of 60 gores each and thread the reefing line through the canopy reefing rings as follows: a.    At a suitable point below the canopy skirt (lower lateral band), position a large line separator between the two groups of suspension lines.  Insert line 61 into the right slot of the line separator and line 61 into the right slot. b.    While holding line 61 in position in the line separator, pick up the right suspension line group and throw the right group of gores and lines over the left group of gores and lines. Line Separator Line 61 Line 60







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.