• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Installing suspension line stow ties - TM-10-1670-280-23P_190
Stowing the suspension lines and suspension risers - TM-10-1670-280-23P_192

TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Page Navigation
  162    163    164    165    166  167  168    169    170    171    172  
TM 10-1670-280-23&P                                                       0013 00 0013 00-35 c.     Secure each end and the middle of the suspension line wrap with one turn single ticket No. 8/4, orange cotton thread.    d.    Secure each thread end with a surgeon’s knot and locking knot.  Ensure the suspension lines are not inadvertently secured to the center loop strap on top of the deployment bag.    e.    Trim tie ends to 2-inches.    NOTE If the suspension line protector flap is damaged, it may be removed from the deployment bag.  Remove by cutting the flap material as close to the deployment bag body as possible. 16. Tacking the suspension line protector flap. a.    Extend the deployment bag suspension line protector flap over the locking stows. b.    Secure each lower outside corner of the suspension line protector flap to the deployment bag by hand tacking using one turn single, orange cotton thread ticket No. 8/4 at each tacking point.    c.     Pass the tacking needle through the deployment bag outside edge of the reinforcement strap and the protective flap edge reinforcement.    Ticket No. 8/4, Orange Cotton Tie







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.