• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Installing suspension line stow ties - TM-10-1670-280-23P_94
Stowing the suspension lines and suspension risers - TM-10-1670-280-23P_96

TM-10-1670-280-23P Parachute Cargo Type: 100-Foot Diameter Model G-11B G-11C and G-11D NSN 1670-01-016-7841 Manual
Page Navigation
  66    67    68    69    70  71  72    73    74    75    76  
TM 10-1670-280-23&P                                                       0011 00 0011 00-35 15. Wrapping the suspension lines. a.    Extend the suspension lines and center line along the top center of the deployment bag toward the bridle end of the bag. b.    Using a 12-inch wide by 36-inch long piece of kraft paper, wrap the suspension lines extended along the top center of the deployment bag. c.     Secure each end and the middle of the suspension line wrap with one turn single ticket No. 8/4, orange cotton thread.    d.    Secure each thread end with a surgeon’s knot and locking knot.  Ensure the suspension lines are not inadvertently secured to the center loop strap on top of the deployment bag.    e.    Trim tie ends to 2-inches.    NOTE If the suspension line protector flap is damaged, it may be removed from the deployment bag.  Remove by cutting the flap material as close to the deployment bag body as possible. 16. Tacking the suspension line protector flap. a.    Extend the deployment bag suspension line protector flap over the locking stows. Ticket No. 8/4, Orange Cotton Tie







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.