• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2-95.5.  First and Second Suspension Line Stowed, G-12E
Figure 2-95.7.  Lacing Deployment Bag, G-12E

TM-10-1670-281-23P Parachute Cargo Type: 64-Foot Diameter Model G-12D NSN 1670-00-893-2371 and Model G-12E NSN 1670-01-060-3705 Manual
Page Navigation
  112    113    114    115    116  117  118    119    120    121    122  
ARMY TM 10-1670-281-23&P AIR FORCE T.O. 13C5-32-2 NAVY NAVAIR 13-1-32 (f)  Stow and secure the suspension risers using the procedures in stop (d) above. Make the last suspension  riser  tie  16  inches  above  the  suspension  clevis  to  the  center  stow  loop  on  the- stowage  panel  using  the  second  web  tie  installed  in  step  (8)(a),  above.    Make  a  surgeon's knot and locking knot.  Trim all tie ends to 2 inches (figure 2-95.6). Figure 2-95.6.  Suspension Line, Center line, and Riser Stowage Completed, G-12E (14)  Lacing the deployment bag. (a)    Bring  the  deployment  bag  cover  over  the  stowage  panel.  The  hops  on  the  cover  should overlap the loops on the side-of the bag. (b)  Cut two 60 inch lengths of 1/4 inch wide, type I cotton webbing, for use as lacing material. Change 4 2-98.6







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.