• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2-3.  Inside Back Cover of Parachute Log Record - TM-10-1670-281-23P_36
Figure 2-6.  Data Entries for a Log Record Note Page - TM-10-1670-281-23P_38

TM-10-1670-281-23P Parachute Cargo Type: 64-Foot Diameter Model G-12D NSN 1670-00-893-2371 and Model G-12E NSN 1670-01-060-3705 Manual
Page Navigation
  13    14    15    16    17  18  19    20    21    22    23  
ARMY TM 10-1670-281-23&P AIR FORCE T.O. 13C5-32-2 NAVY NAVAIR 13-1-32 (3)  Modification work order compliance record page.  When a modification is performed on a parachute canopy, the following entries will be made on the "Modification Work Order Compliance Record" pages of the Log Record (figure 2-4). 4839-013 Figure 2-4.  Log Record Entries for the Modification Work Order Compliance Record Page.   (a)    MWO  number.    Enter  the  publication  number  and  date  of  the  Modification  Work  Order (MWO) which describes the MWO (1, figure 2-4). (b)  MWO title.  Enter a short, abbreviated title extracted from the MWO prescribing the work. (c)  Modified by.  Enter-the last name of the individual who has performed the modification.  If the original  log  record  for  the  parachute  has  been  lost,  and  it  has  been  ascertained  through  inspection  that  a particular modification has been accomplished, the entry for this column will be C/W "Complied With" (2, figure 2-4), which signifies the applicable MWO has been complied with. (d)  Inspected by.  The individual who accomplished the inspection required after modification will sign this entry with his last name only. (e)  Unit.  Enter the unit designation responsible for performing the MWO or, in the event of a lost Log Record, the unit to which the inspector is assigned. (f)  Date.  Enter the day, month, and year the modification- work was completed. (4)   Unit  and  intermediate  repair  and  inspection  data.    When  a  parachute  canopy  assembly  is  initially received    from    a    supply    source    and    a    technical/rigger-type    inspection    is    performed,    the    inspection accomplishment  will  be  documented  on  the  "Unit  and  Intermediate  Repair  and  Inspection  Data"  page  of  the individual Parachute Log Record (figure 2-5).  Additional entries will also be made on this page each time the canopy   assembly   is   repaired   or   is   administered   an   inspection   in   compliance   with   a   one-time   inspection Technical Bulletin (TB).  The page completion criteria is as follows: (a)      Type   of   repair.        Enter    the    type    of    repair,    completion    of    initial    inspection,    repair accomplishment, Technical Bulletin Inspection compliance. (b)  Inspection by.  The individual who accomplished the inspection required will sign this entry with last name. 2-6







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.