• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4.  Extraction Line Bag with Ties Install
Figure 8.  Extraction Line Tied to Top Panel with First Stow

TM-10-1670-286-20 Extraction Line Panel NSN 1670-01-183-2678 Manual
Page Navigation
  89    90    91    92    93  94  95    96    97    98    99  
TM 10-1670-286-20 EXTRACTION LINE PANEL PROCEDURES FOR C-17 GLOBEMASTER III                                 0016 00 STOWING THE 140-FOOT THREE LOOP EXTRACTION LINE TO THE EXTRACTION LINE PANEL WITH EXTRACTION BRIDLE ATTACHED 0016 00-5 Figure 5.  Extraction Line Secured to Bottom Panel.         d.  Beginning at the upper left corner of bottom panel, make first S-fold/stow of extraction line and           secure with previously installed type I, ¼-inch cotton webbing (figure 6). Figure 6.  First S-Fold of Extraction Line. NOTE Stows must not extend beyond the edge of the panel.         e.  Working from left to right, stow and secure extraction line on bottom panel (13 stows on the left           and 13 on the right) with extraction line routed from bottom panel at lower left corner.  Secure           extraction line using type I, ¼-inch cotton webbing with a surgeon’s knot and locking knot.         f.  Run the extraction line up the left side of bottom panel.  Wrap with second piece of cotton muslin           cloth and secure in three places with two turns single, type I, ¼-inch cotton webbing, (same as the   3-Foot Mark Securing Ties 24 IN Tie on 1, 6, and 12 3 x 16 IN Cotton Muslin Cloth Bottom Panel First S-Fold







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.