• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3.  Extraction Parachute Attached to Extraction Line
EXTRACTION LINE PANEL PROCEDURES FOR C-17 GLOBEMASTER III STOWING 120/140-FOOT SIX LOOP EXTRACTION LINE TO EXTRACTION   LINE PANEL WITH EXTRACTION LINE BRIDLE ATTACHED

TM-10-1670-286-20 Extraction Line Panel NSN 1670-01-183-2678 Manual
Page Navigation
  102    103    104    105    106  107  108    109    110    111    112  
TM 10-1670-286-20 EXTRACTION LINE PANEL PROCEDURES FOR C-17 GLOBEMASTER III                                   0017 00 ATTACHING THE 28-FOOT EXTRACTION PARACHUTE TO THE 140-FOOT, THREE LOOP EXTRACTION LINE AND EXTRACTION LINE BAG 0017 00-5/(6 Blank)         f.  Safety the two-point link to the bag closing loops (centered between the bag closing loops) with           the two lengths of type III nylon cord.  Pass one length around adapter web attaching bolt on the two-         point link and through top left bag-closing loop.  Pass the second length around the adapter web           attaching bolt on the two-point link and through top right bag closing loop.  Secure with surgeon’s knot,           locking knot, and an overhand knot in the running end (figure 4).         g.  Cut a 24-inch length of type I, ¼-inch cotton webbing, double and secure extraction line to top                   right deployment bag tie loop (figure 4). Figure 4.  Safety Ties Installed. END OF WORK PACKAGE







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.