• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SETTING DEPLOYMENT BREAKS
SETTING DEPLOYMENT BREAKS CONT. - TM-10-1670-287-23P_172

TM-10-1670-287-23P MC-4 RAM Air Free-Fall Personnel Parachute System NSN 1670-01-306-2100 Manual
Page Navigation
  140    141    142    143    144  145  146    147    148    149    150  
TM 10-1670-287-23&P 0014 00 0014 00-9 2.    Insert top of control toggle through loop 1-inch. 3.    S-fold control line and neatly stow excess line along side each ring, ensuring that no folded loops extend above or below excess control line keepers.  Ensure that excess line is to the right (pile) side of the keeper.  Close excess control line keepers. Toggle Thong Finger Trapped Loop Control Line Control Line Keeper







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.