• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ATTACHMENT OF CANOPY TO RISERS CONT. - TM-10-1670-287-23P_58
INSTALLATION OF SAFETY STOW; ELASTIC LOOP IN DEPLOYMENT BAG

TM-10-1670-287-23P MC-4 RAM Air Free-Fall Personnel Parachute System NSN 1670-01-306-2100 Manual
Page Navigation
  36    37    38    39    40  41  42    43    44    45    46  
TM 10-1670-287-23&P                                                 0005 00 0005 00-9 6.    Hand-tack each riser below the connector link with one turn double, tape lacing and tying, and with an overhand knot. 7.    Remove parachute from suspension device and place in proper layout. APPLICATION OF MARKINGS Apply markings as follows: NOTE When a parachute component is placed in service, the month and year of date placed in service shall be marked on it. 1.    Canopy.  On cell with data block. 2.    Harness/container.  On left diagonal back strap near the data label. 3.    Pilot chute assembly.  Anywhere on fabric area that will be visible after marking. 4.    Slider.  Anywhere on fabric area that will be visible after marking. 5.    Risers.  Stencil riser on fabric, in suitable location (near data tag). 6.    Allow marking to dry 20 to 30-minutes. Connector Link Tacking Riser







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.