• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
UNIT MAINTENANCE MC1-1C/MC1-1D TROOP BACK PARACHUTE ASSEMBLY DEPLOYMENT BAG CONT. - TM-10-1670-292-23P_202
UNIT MAINTENANCE MC1-1C/MC1-1D TROOP BACK PARACHUTE ASSEMBLY DEPLOYMENT BAG CONT. - TM-10-1670-292-23P_204

TM-10-1670-292-23P Parachutes Personnel Type: 35-Foot Diameter MC1-1C Troop Back Parachute Assembly NSN 1670-01-262-2359 Manual
Page Navigation
  169    170    171    172    173  174  175    176    177    178    179  
TM 10-1670-292-23&P                                                       0029 00 0029 00-9 a.    Repair.  Proceed as follows: (1)  Remove damaged lanyard or safety pin by cutting lanyard or untying knots securing the lanyard to the static line. (2)  Cut a 5-inch length of 0.080-inch diameter corrosion resistant steel wire and form a 31/8-inch safety pin. (3)  Remove the core cords from a 20-inch length of type II (or type III), nylon cord.  Tie an overhand knot in each end and sear the ends.  Fold the cord in half and attach to the safety pin with a girth-hitch. (4)  Tie an overhand knot in the cord no closer than 5-inches from the safety pin.  Run one end of the cord through the static line loop, where the snap hook is attached, and secure on top of the static line with a surgeon’s knot and a locking knot.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.