• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CLOSING THE DEPLOMENT BAG AND STOWING THE SUSPENSION LINES CONT. - TM-10-1670-293-23P_106
CLOSING THE DEPLOMENT BAG AND STOWING THE SUSPENSION LINES CONT. - TM-10-1670-293-23P_108

TM-10-1670-293-23P Parachute Personnel Type: 35-Foot Diameter T-10C Troop Back Parachute Assembly NSN 1670-01-248-9502 Manual
Page Navigation
  76    77    78    79    80  81  82    83    84    85    86  
TM 10-1670-293-23&P    0011 00 0011 00-35 Change 1 6.    Grasp suspension lines, approximately the width of the bag, and form a second loop that extends 2- inches beyond the hood of the left stow loop. 7.    Insert the left stow hook through the formed suspension line loop.  Ensure the stow hook is around all of the suspension lines. 8.    Pull the suspension line loop through the left locking stow loop.  The enclosures of the stow should extend 2-inches beyond the hoods of the locking stow loop.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.