• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CLOSING THE DEPLOMENT BAG AND STOWING THE SUSPENSION LINES CONT. - TM-10-1670-293-23P_108
TYING CONNECTOR LINKS AND SUSPENSION LINE PROTECTIVE COVER - TM-10-1670-293-23P_110

TM-10-1670-293-23P Parachute Personnel Type: 35-Foot Diameter T-10C Troop Back Parachute Assembly NSN 1670-01-248-9502 Manual
Page Navigation
  78    79    80    81    82  83  84    85    86    87    88  
TM 10-1670-293-23&P    0011 00 0011 00-37 Change 1 11.   Rigger check number 4. 12.  Rotate the deployment bag one quarter-turn clockwise. 13.  Grasp the suspension line, approximately the width of the deployment bag; slide the bag on the table and form the second regular stow in the upper left corner of the bag. 14.  Using a stow hook, make a second regular stow in the upper left corner. 15.  Continue alternating the stows from right to left until approximately 8- to 10-inches of suspension lines are left unstowed.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.