• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CLOSING THE DEPLOMENT BAG AND STOWING THE SUSPENSION LINES CONT. - TM-10-1670-293-23P_109
TYING CONNECTOR LINKS AND SUSPENSION LINE PROTECTIVE COVER CONT. - TM-10-1670-293-23P_111

TM-10-1670-293-23P Parachute Personnel Type: 35-Foot Diameter T-10C Troop Back Parachute Assembly NSN 1670-01-248-9502 Manual
Page Navigation
  79    80    81    82    83  84  85    86    87    88    89  
TM 10-1670-293-23&P    0011 00 Change 1 0011 00-38 16.  Rigger check number 5. NOTE There should be a minimum of 8 stows on each panel. 17.  Remove the connector links from the tension plate. 18.  Fold the excess slack from the remaining suspension lines over the stowed suspension lines.   TYING CONNECTOR LINKS AND SUSPENSION LINE PROTECTIVE COVER To secure the packed deployment bag, continue as follows: 1.    Unroll suspension line protector cover and cover suspension lines. NOTE Ensure the risers are still in proper layout. 2.    Using a 14-inch length of Type I, ¼-inch, cotton webbing, pass an end through the right bottom connector link tie loop, through right pair connector links, through top right connector link tie loop, and through cover tie loop.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.