• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Prepare Ejector Spring.
Figure 5. Laying Out the Canopy.

TM-10-1670-327-23-P MC-6 Personnel Parachute System NSN 1670-01-527-7537 Manual
Page Navigation
  150    151    152    153    154  155  156    157    158    159    160  
TM 10-1670-327-23&P
0016 00
Attach The Apex To Table
1. Locate one of the green apex extractor attaching loops (figure 3, item 1) (identified by a double
bartack) and working in a counter-clockwise direction, pass the apex hookup lanyard (figure 3, item
2) through all of the apex loops (figure 3, item 1).
2
1
Figure 3. Passing Apex-packing Loop Through All Apex Loops.
2. Cut a 24-inch length of Ticket 8/4 Cotton Thread (figure 4, item 1) and route one end through the
apex hookup lanyard (figure 4, item 2).
3. Attach both ends of the apex hookup lanyard to the apex hook (figure 4, item 3).
2
3
1
Figure 4. Attaching Ends of Packing Loop to Apex Hook.
0016 00-5






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.