• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 40. Folding the Extractor Canopy into Thirds.
Figure 44. Centering Extractor on Top of Folded Canopy.

TM-10-1670-327-23-P MC-6 Personnel Parachute System NSN 1670-01-527-7537 Manual
Page Navigation
  175    176    177    178    179  180  181    182    183    184    185  
TM 10-1670-327-23&P
0016 00
6. Place the extractor (figure 42, item 1) on top of the apex area under the packing weight (figure 42,
item 2).
1
2
Figure 42. Placing Extractor on Top of Apex Area.
7. S-fold the extractor attachment lines (figure 43, item 1) and place the folded lines neatly on top of the
apes.
1
Figure 43. S-folding Extractor Attachment Lines.
0016 00-30






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.