• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MAIN CANOPY FORWARD EXTENDED GORE ASSEMBLY REPLACE
Figure 4. Aligning New Extended Gore with Open Gore.

TM-10-1670-327-23-P MC-6 Personnel Parachute System NSN 1670-01-527-7537 Manual
Page Navigation
  226    227    228    229    230  231  232    233    234    235    236  
TM 10-1670-327-23&P
0029 00
REPLACE continued
4. Before removing stitching of the extended gore, mark the bartack location on the break slot with chalk
where the bartack intersects the main seam. This will establish the break slot.
5. Carefully remove stitching on the damaged extended gore assembly. Take note on how the extended
gore is attached. Clean the area by removing all loose pieces of thread.
NOTE
There is some overlap of the reinforcement tapes on the forward and aft extended gores.
You may need to remove some of the stitching of the aft extended gore. This stitching
must be replaced when the new forward extended gore is sewn into place.
6. Take a new forward extended gore (Figure 1). Ensure that you have the correct assembly; left
extended gore assembly for the jumpers left side; right extended gore assembly for the jumpers right
side.
Left
Right
Forward
Forward
Aft Edge
Aft Edge
Edge
Edge
Figure 1. Identifying a Left and Right Extended Gore Assembly.
0029 00-2






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.