• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Inserting Scale Hook-end into Girth Hitch.
MAIN CANOPY MIDDLE AND UPPER LEFT/RIGHT AFT CONTROL LINE ASSEMBLY REPLACE

TM-10-1670-327-23-P MC-6 Personnel Parachute System NSN 1670-01-527-7537 Manual
Page Navigation
  240    241    242    243    244  245  246    247    248    249    250  
TM 10-1670-327-23&P
0032 00
REPLACE - continued
4
1
3
2
Figure 6. Routing Control Line Through Channel, Guide Ring, and Toggle.
7. Push the toggle (figure 7, item 1) up past the 282 inch mark (figure 7, item 2) and tie two overhand
knots (figure 7, item 3) on top of each other, below the toggle, such that the yellow mark (282 inch
mark) is located in the center of the first knot.
1
2
3
Figure 7. Tying First Two Overhand Knots.
8. Leave a gap of about 2.5 inches (3 fingers width) and tie another overhand knot (figure 8, item 1).
1
Figure 8. Tying Final Overhand Knot.
END OF WORK PACKAGE
0032 00-5/(6 Blank)






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.