TM 10-1670-327-23&P
UNIT MAINTENANCE
MC-6 PERSONNEL PARACHUTE SYSTEM
NSN 1670-01-527-7537
MAIN DEPLOYMENT BAG
INSPECT, REPAIR
INITIAL SETUP:
Tools
Personnel Required
As required
92R (10) Parachute Rigger
Materials/Parts
Equipment Condition
Lay out on packing table or other suitable area.
INSPECT
Refer to WP 0009 00 "PMCS", and WP 0012 00 "INSPECTION", for inspection procedures.
REPAIR
Restitch Main Deployment Bag
Stitching. Stitch and restitch with size E nylon thread that matches the color of the original stitching,
when possible. Lock all straight stitching by backstitching at least 1/2-inch. Restitch directly over the
original stitching; follow the original stitch pattern as closely as possible.
Restencilling. If necessary, restencil the bag number on the suspension line protector cover in
accordance with WP 0019 00.
Darn Main Deployment Bag
Darning will be accomplished IAW WP 0017 00.
Repair Deployment Bag
Refer to individual repair procedures.
END OF WORK PACKAGE
0082 00-1/(2 Blank)