TM 10-1670-327-23&P
UNIT AND DIRECT SUPPORT MAINTENANCE
MC-6 PERSONNEL PARACHUTE SYSTEM
1670-01-527-7537
MAINTENANCE ALLOCATION CHART (MAC)
Table 1. MAINTENANCE ALLOCATION CHART for
MC-6 PERSONNEL PARACHUTE SYSTEM
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE LEVEL
TOOLS AND
FIELD
SUSTAINMENT
GROUP
COMPONENT/ASSEMBLY
MAINTENANCE
EQUIPMENT
REMARKS
DIRECT GENERAL
NUMBER
FUNCTION
REFERENCE
CODE
UNIT
SUPPORT SUPPORT DEPOT
CODE
C
O
F
H
D
00
MC-6 PARACHUTE,
PERSONNEL
01
CANOPY, MAIN
Inspect
1.0
A,B,C,D,E
A,B,C,D,E
Repair
4.0
A,B,C,D,E
Replace
1.0
0101
LOOP, VENT
Inspect
0.1
A
Repair
0.3
55
A,E
Replace
0.5
27,28,55
A,E
A
0.1
0102
LINE, VENT
Inspect
A,E
55
0.3
Repair
27,28,55,59 A,E
0.7
Replace
0103
LINE, VENT LOOP
Inspect
0.1
A
CENTERING
Replace
0.6
27,28,59
A,E
0104
BAND, VENT
Inspect
0.1
A
Repair
0.5
27,28,56
A,E
0105
SEAM, CROSS
Inspect
0.1
A
Repair
0.5
27,54
A,E
0106
SEAM, RADIAL
Inspect
0.1
A
Repair
0.5
27,54
A,E
A
0.1
0107
TAPE, REINFORCING
Inspect
A,E
0.3
Repair
48,54,56,51 A,E
0.7
Replace
0108
LOOP, ATTACHMENT
Inspect
0.1
A
Replace
0.3
27,28,51
A,E
A
0.2
0109
SECTIONS (A, B, B1, B2,
Inspect
B3, C, D), GORE PANEL
A,E
27,32,51,
0.5
Repair
56,60,61
A,E
54,56,61
2.0
Replace
,60,39
0110
ASSEMBLY (FORWARD
Inspect
0.1
A
AND AFT) , RIGHT AND
Replace
2.0
A,E
27,54,51,
LEFT EXTENDED GORES
29,61
0097 00-1