TM 10-1670-269-23&P
0012 00
0012 00-6
4. With lines 1 and 24 on the inside of the connector snaps and lines 12 and 13 on the outside of the
connector snaps, the parachute is now in proper layout, ready for folding the gores.
NOTE
If parachute is being packed for the first time, insert ripcord grip in
the pocket and remove with a twisting motion five times to flex
ripcord pocket.
5. Install ripcord in ripcord grip pocket.
FOLDING THE GORES
After the parachute has been properly laid out, proceed as follows:
1. Move to the apex end of the table and dress the upper lateral band. Apply pressure toward the
tension end of the table until the upper lateral band is aligned. Apply sufficient tension at the tension
plate to hold the canopy and suspension lines taut.
2. Move to the lower lateral band of the canopy. Lift right group of suspension lines with the left hand at
canopy skirt. Hold top center gores in position with the right hand, and with left hand flip right group
of gores over left group.
UPPER LATERAL
BAND
DIRECTION
OF PULL
APEX LINES