Home
Download PDF
Order CD-ROM
Order in Print
Maintenance Forms and Records - TM-10-1670-271-23P_15
Figure 1-1. 35-Foot Diameter, T-10B Troop Back Parachute Assembly, Deployed
Reporting of Equipment Improvement Recommendations (EIR) - TM-10-1670-271-23P_17
Section II. EQUIPMENT DESCRIPTION AND DATA - TM-10-1670-271-23P_18
Figure 1-2. Canopy Assembly
Figure 1-3. Pack Tray
Figure 1-4. Deployment Bag
Figure 1-5. T-10B Parachute Harness Assembly
Figure 1-6. T-10B Parachute Riser Assembly
Safety, Care and Handling
CHAPTER 2 MAINTENANCE INSTRUCTIONS
Section II. SERVICE UPON RECEIPT - TM-10-1670-271-23P_26
Figure 2-1. Installing Attachment Tie on Parachute Log Record.
Figure 2-2. Inside Front Cover of Parachute Log Record - TM-10-1670-271-23P_28
Figure 2-4. Log Record Entries for the Modification Work Order Compliance Record Page - TM-10-1670-271-23P_29
Figure 2-5. Log Record Entries for Unit and Intermediate Repair and Inspection Data Page - TM-10-1670-271-23P_30
Figure 2-6. Data Entries for a Log Record Note Page - TM-10-1670-271-23P_31
Figure 2-7. Attaching Pack Tray to the T-10B Harness
Figure 2-8. Assembling Cable Loop-Type Canopy Release
Adapting the T-10B Parachute Harness to Open-Circuit Scuba Equipment
Table 2-1. Preventive Maintenance Checks and Services (PMCS)
Table 2-1. Preventive Maintenance Checks and Services (PMCS) - CONT
Table 2-1. Preventive Maintenance Checks and Services (PMCS) (CONT). - TM-10-1670-271-23P_37
Table 2-1. Preventive Maintenance Checks and Services (PMCS) (CONT). - TM-10-1670-271-23P_38
Section V. UNIT AND INTERMEDIATE MAINTENANCE PROCEDURES - TM-10-1670-271-23P_39
Shakeout and Airing - TM-10-1670-271-23P_40
Figure 2-9. Shakeout
Cleaning and Drying - TM-10-1670-271-23P_42
Cleaning Fabric Items with Cleaning Solvent - TM-10-1670-271-23P_43
Cleaning and Drying (CONT) - TM-10-1670-271-23P_44
Drying Fabric Items - TM-10-1670-271-23P_45
Inspection - TM-10-1670-271-23P_46
Pack-in-Process Inspection. - TM-10-1670-271-23P_47
Acidity Test - TM-10-1670-271-23P_48
Salt-Water Contamination Test - TM-10-1670-271-23P_49
Packing theT-10B Parachute
Packing theT-10B Parachute CONT.
Figure 2-10. Rigger's Orientation
Figure 2-12. Removing Inversion
Figure 2-13. Removing Turns from Suspension Lines - TM-10-1670-271-23P_54
Figure 2-14. Removing Tangles from Suspension Lines - TM-10-1670-271-23P_55
Figure 2-15. Removing Twists from Suspension Lines
Figure 2-16. Tracing Suspension Lines to Connector Links
Figure 2-17. Parachute in Proper Layout
Figure 2-18. Dressing Apex
Figure 2-20. Folding First Gore of Right Group
Figure 2-22. Completed Scissoring and Rotating Right Group of Suspension Lines
Figure 2-23. Folding Last Two Gores of Left Group
Figure 2-24. Two Groups of Lines Inserted in Line Separator and Folded Gores Draped to Right Side of Table
Figure 2-26. Packing Weight on Suspension Lines
Figure 2-28. Flatfolding the Canopy
Packing the T-10B Parachute (CONT).
Figure 2-29. Dressing Right Side
Figure 2-30. Flatfolding Completed.
Figure 2-32. Longfolding the Net and Lower Lateral Band
Figure 2-33. Beginning Longfold of Canopy
Figure 2-34. Right Side of Longfold Completed
Figure 2-35. Beginning Longfold of Left Side/
Figure 2-36. Longfold Completed
Figure 2-37. Deployment Bag Prepared for Stowing of Canopy
Figure 2-38. Tying Static Line Loop to Bridle Loop
Figure 2-39. Static Line Loop Secured to Bridle Loop with Surgeon's Knot and Locking Knot
Figure 2-40. First Canopy Stow
Packing the T-10B Parachute (CONT)
Figure 2-42. Stowing Remaining Canopy and Net.
Figure 2-44. Forming a Locking Loop
Figure 2-46. Right Locking Stow Loop
Figure 2-48. Completing Second Stow
Figure 2-49. Forming First Regular Stow
Figure 2-51. Completing Second Regular Stow
Figure 2-52. Stowed Suspension Lines.
Figure 2-54. Connector Link Ties Completed.
Figure 2-55. Packer Entering Deployment Bag Number
Figure 2-56. Pack Tray Moved Forward on Risers
Figure 2-57. U-Fold of Risers.
Figure 2-58. Rotating Deployment Bag.
Figure 2-59. Static Line Sleeve Folded
Figure 2-60. Threading Type 1, 1/4-inch Cotton Webbing
Stowing the Static Line - TM-10-1670-271-23P_93
Figure 2-61. Tying Pack Closing Loops
Figure 2-63. First Static Line Stow
Figure 2-64. Static Line completely Stowed.
Figure 2-65. Signing Log Record.
Figure 2-66. Attaching 5-Foot Static Line Extension
Figure 2-67. Taped Static Line Extension Cover
Figure 2-68. Stowing 5-Foot Extension Line
Figure 2-69. Attaching Chest Strap Snap
Figure 2-70. Attaching Quick-Ejector Snaps
Figure 2-71. Forming a Quick-Release
Section VI. REPAIR - TM-10-1670-271-23P_104
Repair Procedures
Table 2-2 Sewing Machine Code Symbols
Table 2-3. Stitching and Restitching Specifications - TM-10-1670-271-23P_107
Table 2-3 Stitching and Restitching Specifications (CONT)
Figure 2-72. Darning Method Using a Darning Sewing Machine
Figure 2-73. Hand Darning Method
Figure 2-74. Repair Method Using a Zig-Zag Sewing Machine
Table 2-4. Mending Cloth Patching Specifications
Figure 2-75. Basic Patch Application
Repair Procedures (CONT) - TM-10-1670-271-23P_114
Repair Procedures (CONT) - TM-10-1670-271-23P_115
Repair Procedures (CONT) - TM-10-1670-271-23P_116
Repair Procedures (CONT) - TM-10-1670-271-23P_117
Figure 2-77. Common Miscellaneous Canopy Patches (Sheet 1 of 6)
Figure 2-77. Common Miscellaneous Canopy Patches (Sheet 2 of 6)
Figure 2-77. Common Miscellaneous Canopy Patches (Sheet 3 of 6)
Figure 2-77. Common Miscellaneous Canopy Patches (Sheet 4 of 6)
Figure 2-77. Common Miscellaneous Canopy Patches (Sheet 5 of 6)
Figure 2-77. Common Miscellaneous Canopy Patches (Sheet 6 of 6)
Searing and Waxing - TM-10-1670-271-23P_124
Marking and Restenciling - TM-10-1670-271-23P_125
Bridle Loop - TM-10-1670-271-23P_126
Figure 2-78. Bridle Loop Replacement details
Vent Lines - TM-10-1670-271-23P_128
Figure 2-79. Vent Line Replacement Details
Upper Lateral Band - TM-10-1670-271-23P_130
Figure 2-80. Upper Lateral Band Splicing Details.
Damage Extending Into Radial Seam.
Gore Section - TM-10-1670-271-23P_133
Figure 2-81. Replacing Gore Section 3 or 4
Gore Section. CONT.
Figure 2-82. Replacing Gore Section 2
Figure 2-83. Replacing Gore Section 1
Gore Section (CONT) - TM-10-1670-271-23P_138
Figure 2-84. Bias Constructed Gore Section 5 Replacement.
Radial Seam
Figure 2-85. Securing a Patch on a Radial Seam
Radial Tape - TM-10-1670-271-23P_142
Lower Lateral Band - TM-10-1670-271-23P_143
Figure 2-86. Lower Lateral Band Splicing - Damage Between Radial Seams
Figure 2-87. Lower Lateral Band Splicing Details - Damage Extending Into Radial Seam
Pocket Band - TM-10-1670-271-23P_146
Figure 2-88. Pocket Band Replacement Details
V-Tabs
Figure 2-90. Inside View With Stitching Cut.
Figure 2-91. V-Tab Replacement Details
Anti-Inversion Net
Figure 2-92. Anti-Inversion Net Repairs
Figure 2-93. Basic Net Repairs
Figure 2-94. Repair of Bottom Cord
Suspension Line - TM-10-1670-271-23P_155
Figure 2-95. Suspension Line Replacement.
Figure 2-96. Clove Hitch and Half Hitch
Connector Link - TM-10-1670-271-23P_158
Figure 2-97. L-Bar Connector Link Assembly
Risers
Deployment Bag - TM-10-1670-271-23P_161
Figure 2-98. Deployment Bags with Woven and Rolled Stow Loops
Figure 2-99. Deployment Bags Showing Maximum Damage and Repair to Suspension Line Stow Loops.
Deployment Bag CONT.
Figure 2-100. Machine Darning Method
Figure 2-101. Basic Patch Application
Figure 2-102. Reinforcing Webbing Repair
Deployment Bag (CONT)
Figure 2-105. Locking Stow Loop Hood Replacement
Figure 2-106. Suspension Line Protector Cover Tiedown Loop Replacement
Figure 2-107. Static Line Safety Pin and Lanyard replacement
Figure 2-109. Attaching Snap Hook to Static Line.
Deployment Bag (CONT)
Harness Assembly - TM-10-1670-271-23P_176
Harness Assembly (CONT) - TM-10-1670-271-23P_177
Figure 2-111. Replacement of Horizontal Back strap
Figure 2-112. Fabrication or Canopy Release Pad
Figure 2-113. Inserting and Securing Cellular Rubber in Sleeve
Harness Assembly (CONT) - TM-10-1670-271-23P_181
Figure 2-114. Canopy Release Pad Construction Details
Figure 2-115. Assembly of canopy Release Pad to Harness
Figure 2-116. Ejector Snap Pad Pattern Layout.
Figure 2-117. Ejector Snap Pad Construction Details.
Figure 2-118. Installation of Ejector Snap Pad
Pack Tray - TM-10-1670-271-23P_187
Figure 2-119. Splicing Pack Tray Edge Binding
Figure 2-121. Installation of Horizontal Backstrap Retainer
Figure 2-122. Installation of Diagonal Backstrap Keeper
Figure 2-123. Fabrication of Backstrap Keeper
Figure 2-124. Installation of Socket and Stud Assemblies.
Figure 2-126. Snap fastener Installation Tools
Figure 2-127. Snap Fastener Installation Tools Prepared for Use
Figure 2-128. Installation of Diagonal Backstrap Keepers
Figure 2-129. Installation of Horizontal Backstrap Keepers
Figure 2-130. Repair of Pack Closing Loop
Inside retainer band keeper
Figure 2-131. Replacement of Retainer Band Keeper
Figure 2-132. Replacement of Static Line Slack Retainer
Figure 2-133. Waistband Replacement Details.
Figure 2-134. Waistband Adjuster Panel Fabrication
Waistband extension
Section VII. PREPARATION FOR STORAGE OR SHIPMENT - TM-10-1670-271-23P_204
In-Storage Inspection - TM-10-1670-271-23P_205
Accordion Folding/Rigger Rolling
Figure 2-135. Accordion Folding a Parachute Canopy Assembly
Figure 2-136. Rigger Rolling a Parachute Canopy Assembly
Accordion Folding/Rigger-Rolling (CONT)
APPENDIX A REFERENCES - TM-10-1670-271-23P_210
Forms - TM-10-1670-271-23P_211
APPENDIX B MAINTENANCE ALLOCATION CHART Section I. INTRODUCTION - TM-10-1670-271-23P_212
Maintenance Functions.
Section II. MAINTENANCE ALLOCATION CHART FOR 35-FOOT DIAMETER T-10B TROOP-BACK PARACHUTE ASSEMBLY
Section II. MAINTENANCE ALLOCATION CHART FOR 35-FOOT DIAMETER T-10B TROOP-BACK PARACHUTE ASSEMBLY (CONT) - TM-10-1670-271-23P_215
Section II. MAINTENANCE ALLOCATION CHART FOR 35-FOOT DIAMETER T-10B TROOP-BACK PARACHUTE ASSEMBLY (CONT) - TM-10-1670-271-23P_216
SECTION III. TOOL AND TEST EQUIPMENT REQUIREMENTS - TM-10-1670-271-23P_217
Section IV. REMARKS - TM-10-1670-271-23P_218
APPENDIX C REPAIR PARTS AND SPECIAL TOOLS LIST - TM-10-1670-271-23P_219
EXPLANATION OF COLUMNS (Section II) (CONT) - TM-10-1670-271-23P_220
EXPLANATION OF COLUMNS (Section II) (CONT) - TM-10-1670-271-23P_221
Recoverability code. - TM-10-1670-271-23P_222
PART NUMBER (Column (4)).
Special Information - TM-10-1670-271-23P_224
How to Locate Repair Parts - TM-10-1670-271-23P_225
Abbreviations - TM-10-1670-271-23P_226
Figure C-1. T-10B Troop Back Personnel Parachute
Section II. REPAIR PARTS LIST - TM-10-1670-271-23P_228
Figure C-2. Personnel Canopy w/Net T-10B
GROUP 01 CANOPY, PERSONNEL W/NET T-10B
GROUP 01 CANOPY, PERSONNEL W/NET T-10B cont.
Figure C-3. Deployment Bag - TM-10-1670-271-23P_232
GROUP 03 DEPLOYMENT BAG
Figure C-4. Personnel Harness
GROUP 04 HARNESS, PERSONNEL PARACHUTE
Figure C-5. Personnel Parachute Pack
GROUP 05 PACK, PERSONNEL PARACHUTE
GROUP 99 BULK MATERIALS - TM-10-1670-271-23P_238
CROSS-REFERENCE INDEXES NATIONAL STOCK NUMBER INDEX - TM-10-1670-271-23P_239
CROSS-REFERENCE INDEXES PART NUMBER INDEX - TM-10-1670-271-23P_240
CROSS-REFERENCE INDEXES PART NUMBER INDEX (CONT) - TM-10-1670-271-23P_241
APPENDIX D EXPENDABLE/DURABLE SUPPLIES AND MATERIALS LIST Section I. INTRODUCTION - TM-10-1670-271-23P_242
Section II. EXPENDABLE/DURABLE SUPPLIES AND MATERIALS LIST (CONT) - TM-10-1670-271-23P_243
Section II. EXPENDABLE/DURABLE SUPPLIES AND MATERIALS LIST (CONT) - TM-10-1670-271-23P_244
Section II. EXPENDABLE/DURABLE SUPPLIES AND MATERIALS LIST (CONT) - TM-10-1670-271-23P_245
APPENDIX E ILLUSTRATED LIST OF MANUFACTURED ITEMS - TM-10-1670-271-23P_246
INDEX - TM-10-1670-271-23P_247
INDEX (CONT) - TM-10-1670-271-23P_248
INDEX (CONT) - TM-10-1670-271-23P_249
INDEX (CONT) - TM-10-1670-271-23P_250