ARMY TM 10-1670-271-23&P
AIR FORCE TO 14D1-2-464-2
MARINE CORPS TM 01136B-23&P/1
Figure 2-75. Basic Patch Application.
6 Center the patch material over the prepared hole. Pin the patch material in position.
7 Make a 1/2-inch foldunder on each edge of the patch material and baste the patch to the
prepared area. Basting will be performed using the procedures in paragraph 2-17a.
8 Remove the pushpins securing the canopy to the repair table and secure the patch by
stitching, using the applicable details in figure 2-78 and paragraph 2-17b. Make the first row
of stitching completely around the patch. Turn the canopy over and make a second row of
stitching around the prepared hole Stitching will be performed in accordance with paragraph
2-17b.
9 If applicable, restencil informational data or gore number according to procedures in paragraph
2-19.
2-89