TM 10-1670-272-23&P 0011 00
0011 00-31
2. Grasp the canopy with the left hand, approximately the width of the deployment bag, and place the
second stow in the upper left corner.
NOTE
Move the packing weights down the canopy as necessary.
3. Continue stowing the canopy, in alternating sides of the deployment bag, until the lower lateral band
and the anti-inversion net are reached.