ARMY TM 10-1670-275-23&P
AIR FORCE TO 13C5-25-2
NAVY NAVAIR 13-1-26
(3) Preparing deployment bag for stow.
(a) Position deployment bag at top of canopy vent with suspension line retaining straps facing
up.
(b) As required, attach rubber retainer bands to two lengths of suspension line retaining straps
located on top of bag.
j. Folding the Gores.
(1) Apply tension to canopy assembly.
(2) Pick up right group of suspension lines with left hand. Hold top center gore in position, flip right
group of gores over left group of gores (figure 2-20).
4706-023
Figure 2-20. Flipping Right Gore Group.
2-35