TM 10-1670-277-23&P 0039 00 0039 00-2 1 ½-IN. 4. Insert splicing aid into cord casing at 8-inch mark and work aid through cord to outside at 61/2-inch mark. 5. Pass tapered cord end through both deployment bag bridle straps and attach tapered end to splicing aid. 6. Pull splicing aid back into cord casing at 61/2-inch mark and work aid back through cord casing to outside at 8-inch mark. 7. Remove tapered cord end from splicing aid. Sear tapered end and make an overhand knot in cord running end at a point 1-inch back from seared tapered end. Stretch cord loop to draw knot against cord casing. END OF WORK PACKAGE 6 ½-IN.8-IN. Mark 1-IN.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business