TM 10-1670-277-23&P 0039 00
0039 00-2
1 ½-IN.
4. Insert splicing aid into cord casing at 8-inch mark and work aid through cord to outside at 61/2-inch mark.
5. Pass tapered cord end through both deployment bag bridle straps and attach tapered end to splicing aid.
6. Pull splicing aid back into cord casing at 61/2-inch mark and work aid back through cord casing to outside
at 8-inch mark.
7. Remove tapered cord end from splicing aid. Sear tapered end and make an overhand knot in cord
running end at a point 1-inch back from seared tapered end. Stretch cord loop to draw knot against cord
casing.
END OF WORK PACKAGE
6 ½-IN.
8-IN.
Mark
1-IN.