ARMY TM 10-1670-279-23&P
AIR FORCE T.O. 13C5-27-2
NAVY NAVAIR 13-1-28
Table 2-1. Unit and Intermediate Direct Support (DS) Preventive Maintenance Checks and Services (PMCS).
B - Before
D - During
A - After
Interval
Item
Item to be
No.
B
D
A
inspected
Procedures
NOTE
Any defective material noted must be
repaired prior to use. If the Type X
60-ft. extraction line is found defective,
it will be replaced with the 5-ft. adapter web.
The 22-Foot Diameter
Cargo Extraction
Parachute
1
Parachute Packed
Visually check visible parts for serviceability and
for Use
completeness without opening pack. Check
parachute inspection data record for pack date.
2
Canopy
As canopy is raised, suspended, and lowered
during shakeout, check for dampness, fungus,
acid, grease, oil, dirt, foreign material, holes,
cuts, tears; broken lines and webbing.
Fabric Material
Legibility of marking data; completeness;
dampness, fungus, dirt, acid, grease, oil,
foreign material, rips, burns, cuts, breaks,
frays, tears, holes, thin spots, loose weaving;
loose or broken stitching, lines, and webbing.
Hardware
Corrosion, rough spots, burrs, breaks, cracks,
Components
bends; loose or missing screws.
3
Deployment Bag
Completeness; dampness, fungus, acid,
grease, oil, dirt, foreign material, holes, cuts,
and breaks.
Fabric Materials
Completeness; dampness, fungus, dirt, acid,
grease, oil, foreign material, rips, burns, cuts,
breaks, frays, tears, holes; loose or broken
stitching.
Hardware
Corrosion, rough spots, breaks, cracks, bends;
Components
loose or missing grommets.
2-11