TM 10-1670-280-23&P 0013 00
0013 00-15
CAUTION
Failure to evenly distribute the reefing line between each reefing ring will
cause a delay in the parachute deployment, an uneven inflation of the
canopy or result in a malfunction.
NOTE
A packer will take a position near the apex of the canopy and observe
the canopy during the reefing process. If canopy damage is observed
the reefing process will be stopped and the parachute will be processed
for maintenance.
g. Beginning with line 62, one packer passes each line in the right group to a second packer who
threads the right running end of the reefing line through each reefing ring. After each reefing ring is
reefed, the second packer will use a leg to guide the suspension line into the right slot of the line
separator. Continue the gore folding process until lines 61 through 90 are reefed and in the right slot
of the line separator and the gores between each line are folded.
h. Stop the gore folding and from right to left, pass the end of the reefing line through the reefing line
cutter at line 91 and pull 6-inches through.
i.
Pass one end of the second reefing line, from left to right, through the hole in the reefing line cutter at
line 91 and pull 6-inches through.
j.
Secure the two reefing line ends together over the reefing line cutter at line 91 with a surgeons knot
and locking knot. Make an overhand knot in each running end.
k. Trim each tie end at a point 2-inches from the surgeons knot and locking knot.
