TM 10-1670-280-23&P 0013 00
0013 00-50
NOTE
Stow riser extension in accordance with FM 4-20.102 (FM 10-500-2).
28. Closing the riser extension flap.
a. Temporarily secure the riser extension flap until riser extension has been stowed. Secure the flap at
each corner and at the center with ¼-inch cotton webbing.
b. Remove the temporary ties, open riser extension flap and stow riser extension.
c. Bring the riser extension flap across the stowed riser extension.
d. Cut a 36-inch length of ¼-inch cotton webbing for use as a lacing tie.
e. With two half-hitches, secure an end of the webbing length to the first loop on the deployment bag
main body at the right upper corner.
f.
Using the lacing tie running end, lace the riser extension cover flap to the deployment bag main body.
g. Secure the lacing tie free end to the last lace with two half-hitches.
END OF WORK PACKAGE