TM 10-1670-280-23&P 0018 00
0018 00-2
3. Secure the overlapped webbing ends together by stitching a 5-inch long four-point WW-stitch formation,
1/8-inch in from each side edge. Overstitch each webbing end by 1/8-inch. Stitching will be made in
accordance with WP 0014 00, SEWING PROCEDURES, using a heavy-duty sewing machine and size 3
nylon thread. Stitching will be 5 to 8 stitches per inch, using the specifics detailed in the STITCHING AND
RESTITCHING SPECIFICATIONS, Table 2, WP 0014 00.
4. Remove the original canopy attaching loop (bridle loop) from around the canopy vent lines cutting loop
the webbing, as required.
NOTE
G-11A model parachutes that have been converted to G-11Bs may
contain an original bridal loop with a parachute inspection data pocket.
5. If the original parachute inspection data pocket (log record pocket) is serviceable, remove the pocket from
the damaged attaching loop (bridle loop) by cutting the tacking which secures the pocket to the loop
webbing.
6. Install the pocket on the replacement attaching loop (bridle loop) according to original installation details,
and the applicable tacking specifics detailed in WP 0014 00, BASTING AND TEMPORARY TACKING.
END OF WORK PACKAGE