TM 10-1670-280-23&P 0003 00
0003 00-4
7. Remove lacing end from tacking needle and make a finished 10-inch long attaching loop by securing the
two lacing ends together with an overhand knot.
8. Insert log record into the pocket and secure the record within pocket using the pocket flap and applicable
type flap fastener.
Accomplishing a Log Record. Upon completion of first technical/rigger-type inspection, the individual
performing the inspection will initially prepare a log record for an individual parachute and accomplish
subsequent record entries using the following procedures:
NOTE
Log record book entries will be made with a suitable type blue or black
marking device that cannot be erased.
1. Inside front cover. Using the information provided on the parachute canopy data block, make the
following entries on the inside front cover of the log record. Entries may be continued on the inside of the
back cover, if necessary.