TM 10-1670-280-23&P
0050 00
0050 00-4
Table 1. Maintenance Allocation Chart For
100-Foot Diameter Cargo Parachute Assembly, Models G-11B/C/D - Continued
(4)
MAINTENANCE LEVEL
UNIT
INTERMEDIATE
DEPOT
(1)
GROUP
NUMBER
(2)
COMPONENT/ASSEMBLY
(3)
MAINTENANCE
FUNCTION
C
O
F
H
D
(5)
TOOLS AND
EQUIPMENT
(6)
REMARKS
0107
Suspension Line
Repair
Replace
0.4
0.5
0108
Radial Seam
Repair
0.4
E
0109
Radial Line
Reinforcement Tape
Repair
Replace
0.5
0.8
0110
Reefing Line Cutter
Bracket
Repair
Replace
0.3
0.3
F
0111
Cutter Bracket Panel
Reinforcement
Repair
Replace
0.3
0.5
0112
Pocket Band
Repair
Replace
0.3
0.3
E
0113
Reefing Ring Retainer
Repair
Replace
0.1
0.3
E
0114
Reefing Ring
Replace
0.3
E
0115
V-Tab
Inspect
Replace
0.3
0.4
E
0116
Upper and Lower Lateral
Bands
Repair
0.5
E
0117
Connector Link
Repair
Replace
0.1
0.1
E
02
Suspension Riser
Repair
Replace
0.3
0.1
E
0201
Parachute Inspection
Data Pocket
Replace
0.1
03
Center Line
Repair
Replace
0.1
0.1
04
Deployment Bag
Inspect
Service
Repair
Replace
0.3
0.1
0.4
0.1
A, B, F
0401
Deployment Bag
Panels/Flaps
Repair
0.4
E
0402
Deployment Bag Edge
Binding
Repair
0.3
F
0403
Grommet
Repair
Replace
0.2
0.3
F
0404
Deployment Bag
Locking Stow Loop
Repair
Replace
0.3
0.4
E
05
Deployment Bag Bridle
Inspect
Service
Repair
Replace
0.3
0.1
0.4
0.1
A, B, E