TM 10-1670-280-23&P 0011 00
0011 00-7
(6) Ensure the connector link assemblies are threaded on the strap in a manner which positions the
odd numbered suspension lines to the left side of the strap.
(7) Secure the ends of the strap.
RISER LAYOUT
To properly layout the risers, proceed as follows:
1. Adapting the procedures above for locating the suspension lines in the proper layout, remove all turns,
tangles, and twists from the suspension risers.
2. Arrange the three suspension clevis attaching loops at the ends of the suspension risers in order, with
suspension riser of lines 1 through 40 to the left, suspension riser of lines 41 through 80 in the center and
suspension riser of lines 81 through 120 to the right.
3. Install a large suspension clevis through the riser attaching loops to maintain proper layout of the risers.
PACKING THE G-11B PARACHUTE
After preparing the parachute for proper layout, continue packing the G-11B parachute as follows:
1. Group separation of suspension lines.
a. Beginning with the connector link assembly to which suspension line number 1 is attached, count six
connector link assemblies.
b. Grasp all suspension lines attached to the six (6) connector link assemblies and working to the
canopy skirt, separate these lines from the remaining suspension lines.
Suspension Riser
Lines 81-120
Suspension Riser
Lines 41-80
Suspension Riser
Lines 1-40