ARMY TM 10-1670-281-23&P
AIR FORCE T.O. 13C-32-2
NAVY NAVAIR 13-1-32
(g) Pull the two connector linkgroups together against the S-folded center line with the webbing length ends.
(h) Secure the webbing ends on the top center of the link assembly groups with a surgeon's knot and a locking
knot. Trim tie ends to 2 inches (figure 2-76).
(i) All canopy assembly ties are now completed.
Figure 2-76. Connector Links Tied and Secured .
NOTE
The G-1 2E deployment beg must be modified to function properly. Select a Deployment bag which has
been stenciled on the riser extension stowage panel: "D-BAG FOR G-12E ONLY". Modification instructions
can be found in paragraph 2-43.
There are two deployment bags that may be used in the packing of the G-12E. You may use a modified G-
12D deployment bag, PIN 54K6299, as explained in paragraph 2-17(8) thru 2-17(11) or the G-1 2E
deployment bag, P/N 11-1-3967, as explained in paragraph 2-17(12) thru 2-17(14).
(12) Deleted.
Change-4 2-83